Guinea : first review under the three-year arrangement under the Extended Credit Facility, financing assurances review, request for a waiver of nonobservance of a performance criterion and request for modification of performance criteria -- staff report ; informational annex ; press release on the Executive Board discussion ; and statement by the Executive Director for Guinea.

Guinea is making good progress in recovering from a long period of social unrest and military rule. Macroeconomic imbalances have been reduced, major structural reforms are under way, and long-neglected infrastructure is being rebuilt. However, the political transition process is still incomplete, w...

Full description

Saved in:
Bibliographic Details
Online Access:Electronic book from EBSCO
Format: eBook
Language:English
Published:Washington, D.C. : International Monetary Fund, Ã2012.
Series:IMF country report ; no. 12/301.
Subjects:
LEADER 04768cam a2200541Ia 4500
001 ocn817730605
003 OCoLC
005 20220818213019.0
006 m o d
007 cr cnu---unuuu
008 121113s2012 dcua ob i000 0 eng d
040 |a DJB  |b eng  |e pn  |c DJB  |d N$T  |d OCLCA  |d OCLCF  |d EBLCP  |d MHW  |d OCLCQ  |d CUS  |d OCLCA  |d YDXCP  |d OCLCQ  |d AGLDB  |d OCLCQ  |d OCLCA  |d AU@  |d STF  |d OCLCQ  |d OCLCO 
020 |a 9781475525205  |q (electronic bk.) 
020 |a 1475525206  |q (electronic bk.) 
020 |a 9781475576863  |q (electronic bk.) 
020 |a 1475576862  |q (electronic bk.) 
035 |a (OCoLC)817730605 
043 |a f-pg--- 
050 4 |a HC59.15.I15  |b No. 12/301eb 
082 0 4 |a 332.1/52  |2 23 
049 |a LAFW 
245 0 0 |a Guinea :  |b first review under the three-year arrangement under the Extended Credit Facility, financing assurances review, request for a waiver of nonobservance of a performance criterion and request for modification of performance criteria -- staff report ; informational annex ; press release on the Executive Board discussion ; and statement by the Executive Director for Guinea. 
260 |a Washington, D.C. :  |b International Monetary Fund,  |c Ã2012. 
300 |a 1 online resource (90 pages) :  |b color illustrations. 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
490 1 |a IMF country report ;  |v no. 12/301 
500 |a Title from PDF title page (IMF Web site, viewed Nov. 13, 2012). 
500 |a "Prepared by the African Department, in consultation with other departments"--Page 2 of pdf. 
500 |a "October 2012." 
500 |a "September 11, 2012"--Page 2 of pdf. 
504 |a Includes bibliographical references. 
588 0 |a Print version record. 
520 |a Guinea is making good progress in recovering from a long period of social unrest and military rule. Macroeconomic imbalances have been reduced, major structural reforms are under way, and long-neglected infrastructure is being rebuilt. However, the political transition process is still incomplete, with parliamentary elections having been delayed, and social tensions persist. Guinea remains vulnerable to developments in international markets, but risks are mitigated by long-term mining contracts; the key food import is rice, where recent international price increases have been modest and where. 
505 0 |a Cover; Contents; Abbreviations and Acronyms; Executive Summary; I. Introduction; II. Recent Economic Developments and Program Performance; Boxes; 1. Main Factors Affecting Budget Execution in the First Half of 2012; Figures; 1. Recent Economic Developments, 2009-12; 2. Fiscal Developments and Projections, 2012-13; III. Discussions on the Program for the Remainder of 2012 and 2013; A. Fiscal Policy; B. Monetary and Exchange Rate Policy; C. Structural Reforms; 2. An Evolving Governance Structure for the Mining Sector; IV. Program Monitoring, Financing, and Risks. 
505 8 |a V. Medium-Term Plans, the PRSP, and the HIPC Completion PointVI. Staff Appraisal; Tables; 1. Selected Economic and Financial Indicators, 2008-16; 2a. Fiscal Operations of the Central Government, 2010-16 (Billions of Guinean Franc); 2b. Fiscal Operations of the Central Government, 2008-16 (Percent of GDP); 3a. Central Bank and Deposit Money Banks Accounts, 2008-13; 3b. Monetary Survey, 2008-13; 4. Balance of Payments, 2008-16; 5. Indicative Targets Under SMP 2011 and Performance Criteria Under ECF 2012; 6. Performance Criteria (PC) and Indicative Targets, ECF 2012-13. 
505 8 |a 7. External Financing Requirements and Sources, 2011-158. Indicators of Capacity to Repay the Fund, 2012-25; 9. Proposed Schedule of Disbursements and Timing of Reviews Under ECF Arrangement, 2012-15; Appendices; I. Letter of Intent; Attachment I. Supplement to the Memorandum of Economic and Financial Policies; Attachment II. Technical Memorandum of Understanding; Contents; I. Relations with the Fund; II. Joint World Bank-IMF Work Program; III. Relations with the African Development Bank, 2011-13; IV. Millennium Development Goals; V. Statistical Issues. 
506 |a Access limited to authorized users. 
610 2 0 |a International Monetary Fund  |z Guinea-Bissau. 
650 0 |a Economic development  |z Guinea-Bissau. 
650 0 |a Fiscal policy  |z Guinea-Bissau. 
650 0 |a Monetary policy  |z Guinea-Bissau. 
650 0 |a Economic indicators  |z Guinea-Bissau. 
710 2 |a International Monetary Fund.  |b African Department. 
773 |t EBSCOhost Ebook Collection. 
830 0 |a IMF country report ;  |v no. 12/301. 
856 4 0 |u http://ezproxy.lafayette.edu/login?url=https://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&AN=522168  |z Electronic book from EBSCO